Injection Molding Basics

How molds are built, why tooling costs, and what drives molded part price

Injection molding melts plastic pellets and injects them into a closed steel/aluminum cavity under pressure; the part cools, shrinks and is ejected. The mold is the investment — aluminum/prototype tools from ~$2k–8k, production steel tools $10k–100k+ — and unit cost collapses with volume. Design rules (draft, wall uniformity, gating) are locked at tool build, so DFM review before tooling is the highest-leverage engineering step.

1. The molding cycle

Each cycle: clamp the mold, inject melt (~0.1–2 s per mm of wall), pack under pressure, cool (the longest step), eject. Cycle time scales with wall thickness — a 2 mm wall part cycles in ~20–40 s; thinner walls cycle faster but need higher pressure and better flow.

Production volumes reach 100k–1M+ parts per tool with hardened steel; aluminum tools are good for 1k–100k and cheaper. T1 samples (first shots) are as fast as 5 working days on prototype tools — the platform quotes tooling separately, amortized in per-part comparisons.

2. Tooling classes and cost drivers

Mold cost scales with: number of cavities (1-cavity prototype vs 8+ production), complexity (side actions, lifters, inserts, textures), steel grade and size. A simple 1-cavity aluminum tool ≈ $2k–8k; a 4-cavity steel tool with slides ≈ $20k–80k.

The quoting engine prices tooling from part volume and feature complexity: toolingBase + toolingPerVol × part volume, plus per-feature charges for undercuts, threads and texture. Mold ownership transfers to the customer.

3. Part cost structure

Molded unit cost = resin cost (weight × price/kg) + machine cycle cost + finishing/assembly + margin, with quantity tiers discounting setup. Resin is usually a small fraction; wall thickness and cycle time dominate — every 1 mm of extra wall adds seconds per cycle.

At 10k+ units, per-part cost can drop below $1 for small parts; at 100k+, molding is typically 10–50× cheaper per part than machining the same geometry.

4. DFM checklist before tooling

Uniform walls (1–4 mm), draft 1–2° on all vertical faces, ribs 0.5–0.6× wall, no zero-draft undercuts unless side actions are budgeted, gates/ejector marks on non-cosmetic faces, generous radii at transitions, and shrinkage allowance per resin (ABS 0.4–0.7%, PP 1–2.5%).

Get a DFM review before cutting steel: the platform flags wall ratio, draft, and feature issues on upload, and recommends tooling class by quantity.

Quick reference

Tool class Material Shots Lead time Typical cost
Prototype (Class 105) Aluminum / P20 1k–10k 5–15 days $2k–8k
Bridge (Class 103) P20 / H13 10k–100k 15–25 days $8k–30k
Production (Class 101) Hardened steel 100k–1M+ 25–40 days $20k–100k+
High-cavity (8+) Hardened steel 500k–1M+ 35–60 days $50k–200k+

Sources & references

  • DIN 16742 — Plastic part tolerances
  • ISO 294-4 — Shrinkage
  • SPI mold classification
  • Xometry Learning Center — Injection Molding Basics (public engineering reference)